| Name |
Cant
ilever Racking |
Material |
Q235B Steel |
| Size |
Customized
Size |
Color |
Customized Color |
| Depth |
Customized |
Weight Capacity
|
1000kg/arm |
| Width |
Customized |
Height |
Customized |
| Finish |
Powder coating; Hot Dip Galvanized |
| Packing |
Export Package |
| Certification
|
RMI/CE/ISO/TUV/AS4084-2012 |
| MOQ |
One 20ft/40ft Container |
| Free Sample
|
Available (Delivery Cost on Buyer) |
| OEM |
Available |
<
img src="/source_global/c93a7d06031ebbbd11312660c123
32a4/He84eeaaa970747f88d331562c1cc063
2v.jpg" alt="Racking Detail">
1. Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect
2 rows of brackets at both sides of columns in intermediate, as shown.
2. Position the column (1) vertically. Position the column (1) into the fixing MK
base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7)
on the base. Recommended torque: 86~103N.M
3. The standard composition of the
vertical bracing, after it has been fastened to the columns, is as shown in the illustration.
<
div class="aicc_instruction_text">
4. The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M
20x40 bolts (7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use
a Ø14 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M1
0x160 anchors (11). Firmly bolt the fastening plate in place. Recommended torque: 50 MN
5. The arm (12) is fastened to the column (1) using safety pins Ø29x140 (13). Fit the arms
(11) according to the heights and distribution shown on the corresponding project drawing, where applicable.
6. Finally, the completed structure should look like the illustration.
<
div class="aicc_single_image">
Frequently Asked Questions (FAQ)
❓ What are your trading terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against
bill of lading. L/C O/A also available.
2) Lead time: normally in 20-25 days after deposit
received.
3) Sample policy: samples are always available for each model. Samples can be ready in 7-15 days once payment received. <
br>
4) Shipping port: Shanghai / Nanjing China.
5) Discounts: we offer good discount for large quantity.
❓ How can I arrange delivery for my goods?
1) Sea freight: we will update sea freight once we know your sea port where goods will be delivered.
2)
Agent designated by client: please tell us the contact detail of your shipping agent and we will arrange to deliver the items.
❓
What services do you offer?
1) Your inquiry related to our products or price
will be replied in 12 hours.
2) Well-trained and experienced staffs to answer all your inquiries in fluent English.
3) OEM & ODM, any your customized racking we can help you to design product.
4) We have very experienced professional engineers to make best solutions
.
<
span class="aicc_icon_highlight">❓ What is the process to purchase your product?
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping
❓ What are your advantages?
1)
Payment: we can do O/A 40-60 days.
2) Lead time: rush order we can fast delivery.
3) Factory price: factory direct sale competitive price.
4) Warranty: Two years warranty, the broken parts will be replaced
and sent to you.
❓ Does Jracking have MOQ (minimum order quantity) limitation?
No, but good quantity comes with good price. We recommend the order quantity for regular products of Jracking to fit at least
one 20ft container, which is about 15 tons.
<
div class="aicc_faq_question">
❓ How does Jracking charge tooling fee
(cost of opening new mold)?
For the production of necessary tooling requirement
, Jracking charges the cost before the first order for opening new mold, and the cost will be partially or fully refunded after a certain quantity of orders.