Best Price 5-Layer Steel Structural Cantilever Racking Manufactured In China For Timber Storage Warehouse Rack Sale

Product Description

Cantilever Racking Overview
Cantilever Rack System
☰ Product Specifications
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI/CE/ISO/TUV/AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
👁 Product Details & Showcase
⚒ Installation Instructions
Bracing Assembly Step 1
1. Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.
Column Positioning Step 2
2. Position the column (1) vertically. Position the column (1) into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M.
Vertical Bracing Step 3
3. The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.
Base Fastening Step 4
4. The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts(7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a Ø14 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors(11). Firmly bolt the fastening plate in place. Recommended torque: 50 MN.
Arm Installation Step 5
5. The arm (12) is fastened to the column (1) using safety pins Ø29x140 (13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.
Complete Assembly Step 6
6. Finally, the completed structure should look like the illustration.
🖈 Factory & Production Display
Production Process
Manufacturing Standards
Workshop Facilities
📦 Quality & Warehouse Solutions
▦ Related Product Categories
Product Categories Overview
? Frequently Asked Questions (FAQ)
Q: What are your trading terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.
2) Lead time: Normally within 20-25 days after deposit received.
3) Sample policy: Samples are always available for each model. Samples can be ready in 7-15 days once payment received.
4) Shipping port: Shanghai / Nanjing, China.
5) Discounts: We offer competitive discounts for large quantity orders.
Q: How will my goods be delivered?
1) Sea freight: We will update sea freight once we know your destination seaport where goods will be delivered.
2) Agent designated by client: Please provide the contact details of your shipping agent, and we will coordinate delivery accordingly.
Q: What services do you provide?
1) Inquiries related to products or pricing are replied to within 12 hours.
2) Well-trained, experienced staff to assist in fluent English.
3) Complete OEM & ODM services for custom racking project designs.
4) Professional engineering support to produce optimal storage solutions.
Q: What is the process to purchase your product?
Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → QC inspection → Pay balance → Shipping.
Q: What advantages do you offer?
1) Flexible payment: Available O/A 40-60 days.
2) Fast lead times: Rapid handling and delivery for rush orders.
3) Competitive factory pricing: Direct factory sales without intermediary markups.
4) Reliable warranty: Two years warranty coverage with damaged components promptly replaced and shipped.
Q: Does Jracking have an MOQ limitation and how are tooling fees handled?
There is no strict MOQ limitation; however, higher volume yields better pricing. An order fitting at least one 20ft container (approx. 15 tons) is recommended for standard items. For custom tooling requirements, tooling fees are charged prior to the initial run and are partially or fully refundable once qualifying order thresholds are met.

Related Products